Electric generating plantEIA plant no. 60565

Borrego Springs Energy Storage

Type
Other Fossil
Nameplate capacity
1.5 MW
Units
2
In service since
2012–2014
Operator
SDGE Batteries
Location
Borrego Springs, San Diego County, California
Rated 1542nd largest in California · 12718th of 14,761 in the U.S. · by nameplate

Borrego Springs Energy Storage is a other fossil power plant in California with a nameplate capacity of 1.5 MW.

The 1.5 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Location

Address2100 Borrego Valley Road
CityBorrego Springs
CountySan Diego County
StateCalifornia
ZIP92004
Coordinates33.27011, -116.34960
OperatorSDGE Batteries

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
SES2BatteriesBattery1.0 MWOperating2014
SES1BatteriesBattery0.5 MWOperating2012

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Other Fossil plants

Borrego Springs Energy Storage is a federally registered power generation facility in California.

Other plants in San Diego County