Ca - Fresno County - Juvenile Hall

☀ SolarIPP Non-CHP2 MW capacity

1241st largest plant in California · 9578th nationally

Ca - Fresno County - Juvenile Hall is a solar power plant in California with a nameplate capacity of 2.8 MW. It generates roughly 5.4k MWh per year — enough to power about 514 average U.S. homes.

Its capacity factor of 22% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%22%
Peaking — intermittent or backup
Capacity3 MWnameplate
Annual Generation5.4k MWhEPA eGRID
Capacity Factor22%of theoretical max
Annual CO₂metric tons

Location

Plant NameCa - Fresno County - Juvenile Hall
OperatorForefront Power, Llc
CityFresno
CountyFresno County
StateCalifornia
ZIP93725
Coordinates36.66111, -119.72598

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
17031Solar PhotovoltaicSolar2.8 MWOperating2022

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants