Electric generating plantEIA plant no. 56270

Callahan Divide Wind Energy Center

Type
Onshore Wind Turbine
Nameplate capacity
114 MW
Units
1
In service since
2005
Operator
FPL Energy Callahan Wind, LLC
Location
Tusocola, Taylor County, Texas
Rated 522nd largest in Texas · 2517th of 14,761 in the U.S. · by nameplate

Callahan Divide Wind Energy Center is a wind power plant in Texas with a nameplate capacity of 114 MW. It generates roughly 394.7k MWh per year — enough to power about 37,593 average U.S. homes.

Its capacity factor of 40% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Callahan Divide Wind Energy Center could make 998.6k MWh. In 2023 it made 394.7k MWh — the same as running at full power 40 hours in every 100.

Nameplate, full year998.6k MWh114 MW × 8,760 hours
Actually generated394.7k MWhEPA eGRID, 2023 · ≈37,593 homes

Peaking or variableCapacity factor 40%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolarBattery Storage

Location

Address1209 F Cr 618
CityTusocola
CountyTaylor County
StateTexas
ZIP79562
Coordinates32.30389, -100.02167
OperatorFPL Energy Callahan Wind, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind114 MWOperating2005

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Taylor County

View all plants in Taylor County →

Data centers near Callahan Divide Wind Energy Center

Data centerOperatorDistance
Data center, AbileneNot recorded18.8 mi
Data center, AbileneNot recorded18.9 mi
Data center, AbileneNot recorded19.2 mi
Data center, AbileneNot recorded19.4 mi
Data center, AbileneNot recorded19.5 mi
Data center, AbileneNot recorded19.6 mi
Data center, AbileneNot recorded19.8 mi
Data center, AbileneNot recorded19.9 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more