Data center, Abilene

Data center, Abilene is a data center in Abilene, Taylor County, Texas. It is mapped as 5 buildings covering about 11.1 acres (482,000 sq ft). Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.

OperatorOperator not recordedas mapped
Roof area11 ac5 buildings
Grid CO₂733 lbper MWh, ERCT region
Nearest plant2.9 miPlaza Street

Location

This data centerOther data centersPower plants (colored by fuel)

CountyTaylor County, Texas
Coordinates32.49894, -99.77982
On OpenStreetMapway/1530966371, way/1530966372, way/1530966373, way/1530966374, way/1530966375

What powers Data center, Abilene

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Taylor County

UtilityTypeGridBusiness rateIndustrial rate
Taylor Electric Coop Inc - (TX)CooperativeERCOT13.9¢5.4¢

Utilities that report serving Taylor County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Plaza StreetBattery Storage9.9 MW2.9 mi
DGS Five PointsBattery Storage9.9 MW3.0 mi
Heb00070Natural Gas1.2 MW4.7 mi
Wal536Natural Gas1.2 MW4.9 mi
Post Oak Wind LLCWind200 MW7.3 mi
Mesquite Wind Power LLCWind200 MW18.9 mi
Callahan Divide Wind Energy CenterWind114 MW19.5 mi
Buffalo Gap Wind FarmWind121 MW20.9 mi
South Trent Wind FarmWind101 MW21.3 mi
ANSON Solar Center, LLCSolar200 MW23.0 mi

The largest power plant within 50 miles is Horse Hollow Wind Energy Center, a 736 MW wind plant 25 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Data center, AbileneOperator not recorded11 ac0.2 mi
Data center, AbileneOperator not recorded11 ac0.2 mi
Data center, AbileneOperator not recorded11 ac0.4 mi
Data center, AbileneOperator not recorded11 ac0.4 mi
Data center, AbileneOperator not recorded11 ac0.4 mi
Data center, AbileneOperator not recorded11 ac0.7 mi
Data center, AbileneOperator not recorded11 ac0.9 mi

More

Data centers in Texas · Data centers in Taylor County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me