Electric generating plantEIA plant no. 65980

CED West Side Canal Battery Storage

Type
Other Fossil
Nameplate capacity
131 MW
Units
1
In service since
2023
Operator
RWE Clean Energy
Location
El Centro, Imperial County, California
Rated 221st largest in California · 2319th of 14,761 in the U.S. · by nameplate

CED West Side Canal Battery Storage is a other fossil power plant in California with a nameplate capacity of 131 MW.

The 131 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricWindSolarBiomassGeothermalBattery Storage

Location

Address1118 Liebert Road
CityEl Centro
CountyImperial County
StateCalifornia
ZIP92251
Coordinates32.72936, -115.71859
OperatorRWE Clean Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WCBSBatteriesBattery131 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Other Fossil plants