Imperial County, California has 73 power plants totaling 4,558 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| El Centro Hybrid | El Centro | Natural Gas | 388 MW | Imperial Irrigation District |
| Vikings Energy Farm | Holtville | Battery Storage | 287 MW | Vikings Energy Farm, LLC |
| Ocotillo Express LLC | Ocotillo | Wind | 265 MW | Pattern Operators LP |
| Mount Signal Solar Farm V | Calexico | Solar | 252 MW | Imperial Valley Solar 3, LLC |
| Big Rock Solar Farm | El Centro | Battery Storage | 200 MW | Big Rock ESS Assets, LLC |
| Imperial Valley Solar, LLC | Calexico | Solar | 200 MW | Imperial Valley Solar, LLC |
| Centinela Solar Energy | Calexico | Solar | 175 MW | Centinela Solar Energy LLC |
| Solar Gen 2 Solar Facility | Calipatria | Solar | 163 MW | Southern Power Co |
| Mount Signal Solar Farm II | Calexico | Solar | 154 MW | MN8 Energy LLC |
| Imperial Solar Energy Center West | Seeley | Solar | 149 MW | CSOLAR IV West LLC |
| Campo Verde Solar | El Centro | Solar | 147 MW | Southern Power Co |
| CED West Side Canal Battery Storage | El Centro | Other Fossil | 131 MW | RWE Clean Energy |
| Imperial Solar Energy Center South | Calexico | Solar | 129 MW | CSOLAR IV South LLC |
| LeConte Energy Storage | Calexico | Other Fossil | 125 MW | LeConte Energy Storage, LLC |
| Niland Gas Turbine Plant | Niland | Natural Gas | 121 MW | Imperial Irrigation District |
| Wistaria Ranch Solar | Calexico | Solar | 107 MW | RWE Clean Energy |
| Drew Solar LLC | Calexico | Solar | 100 MW | Drew Solar LLC |
| Heber Geothermal | Heber | Geothermal | 91.5 MW | ORCAL Geothermal, Inc |
| North Brawley Geothermal Plant | Brawley | Geothermal | 80.0 MW | Ormat Nevada Inc |
| Arrowleaf Solar and Storage | Brawley | Solar | 77.0 MW | Orni 30 LLC |
| Second Imperial Geothermal | Heber | Geothermal | 74.5 MW | ORCAL Geothermal, Inc |
| Titan Solar 1 (CA) | Borrego Springs | Solar | 70.0 MW | Titan Solar 1, LLC |
| Salton Sea Power LLC - Unit 5 | Calipatria | Geothermal | 58.3 MW | CalEnergy Operating Corporation |
| John L. Featherstone Plant | Calipatria | Geothermal | 55.0 MW | Hudson Ranch Power I LLC |
| Salton Sea Power Gen Co - Unit 3 | Calipatria | Geothermal | 53.9 MW | CalEnergy Operating Corporation |
| Midway Solar Farm 1 | Calipatria | Solar | 50.0 MW | 83wi 8me, LLC |
| Rockwood | Brawley | Natural Gas | 49.8 MW | Imperial Irrigation District |
| Salton Sea Power Gen Co - Unit 4 | Calipatria | Geothermal | 47.5 MW | CalEnergy Operating Corporation |
| Ormesa III | Holtville | Geothermal | 45.6 MW | Ormat Nevada Inc |
| CE Leathers | Calipatria | Geothermal | 45.5 MW | CalEnergy Operating Corporation |
| Del Ranch Company | Calipatria | Geothermal | 45.5 MW | CalEnergy Operating Corporation |
| Elmore Company | Calipatria | Geothermal | 45.5 MW | CalEnergy Operating Corporation |
| Vulcan-BN Geothermal Power Company | Calipatria | Geothermal | 39.6 MW | CalEnergy Operating Corporation |
| Pilot Knob | Winterhaven | Hydroelectric | 33.0 MW | Imperial Irrigation District |
| Seville 2 | Ocotillo Wells | Solar | 30.0 MW | Deriva Energy |
| Midway Solar Farm II | Calipatria | Solar | 30.0 MW | Dominion Renewable Energy |
| Citizens Imperial Solar | Calipatria | Solar | 30.0 MW | Citizens Enterprises Corporation |
| Holtville | Holtville | Battery Storage | 30.0 MW | Greenbacker Renewable Energy Corporation |
| Ormesa II | Holtville | Geothermal | 24.0 MW | Ormat Nevada Inc |
| Imperial Valley Solar Company 1 LLC | Niland | Solar | 23.0 MW | Imperial Irrigation District |
| Geo East Mesa II | Holtville | Geothermal | 21.6 MW | Ormat Nevada Inc |
| Mesquite Lake Energy Park Plant 2 | Imperial | Biomass | 21.0 MW | Mesquite Lake Energy Park |
| Salton Sea Power Gen Co - Unit 2 | Calipatria | Geothermal | 20.0 MW | CalEnergy Operating Corporation |
| Sol Orchard El Centro PV | El Centro | Solar | 20.0 MW | Sol Orchard Imperial 1, LLC |
| Calipatria Solar Farm | Calipatria | Solar | 20.0 MW | Southern Power Co |
| Imperial Valley Solar Co (IVSC) 2, LLC | Niland | Solar | 20.0 MW | Onward Energy |
| Seville 1 | Ocotillo Wells | Solar | 20.0 MW | Deriva Energy |
| Midway Solar Farm III | Calipatria | Solar | 20.0 MW | Greenbacker Renewable Energy Corporation |
| Wister Solar | Niland | Solar | 20.0 MW | Wister Solar |
| Drop 4 | Holtville | Hydroelectric | 19.6 MW | Imperial Irrigation District |
| Ormesa I | Holtville | Geothermal | 19.0 MW | Ormat Nevada Inc |
| CE Turbo LLC | Calipatria | Geothermal | 11.5 MW | CalEnergy Operating Corporation |
| Heber Solar | Heber | Solar | 10.9 MW | Axium US Solar Holdings LLC |
| Drop 2 (CA) | Holtville | Hydroelectric | 10.0 MW | Imperial Irrigation District |
| Salton Sea Power Gen Co - Unit 1 | Calipatria | Geothermal | 10.0 MW | CalEnergy Operating Corporation |
| Drop 3 (CA) | Holtville | Hydroelectric | 9.2 MW | Imperial Irrigation District |
| Spreckels Sugar Company | Brawley | Natural Gas | 8.9 MW | Spreckels Sugar Company |
| Centinela State Prison | Sacramento | Solar | 6.0 MW | Ecoplexus, Inc |
| Calipatria State Prison | Calipatria | Solar | 6.0 MW | Ecoplexus, Inc |
| Community Solar 1 | Brawley | Solar | 5.7 MW | Solar Community I LLC |
| Drop 1 | Holtville | Hydroelectric | 5.7 MW | Imperial Irrigation District |
| Siphon Drop Power Plant | Winterhaven | Hydroelectric | 4.4 MW | Yuma County Water User's Association |
| Drop 5 (CA) | Calexico | Hydroelectric | 4.0 MW | Imperial Irrigation District |
| SEPV Imperial Dixieland West | Imperial | Solar | 3.0 MW | AES Distributed Energy |
| Valencia 1 Solar CA | Westmorland | Solar | 3.0 MW | Altus Power America Management, LLC |
| IVC Solar | Imperial | Solar | 3.0 MW | Imperial Irrigation District |
| Valencia 2 | Imperial | Solar | 3.0 MW | Greenbacker Renewable Energy Corporation |
| Valencia 3 | Imperial | Solar | 3.0 MW | Greenbacker Renewable Energy Corporation |
| East Highline | Holtville | Hydroelectric | 2.4 MW | Imperial Irrigation District |
| SEPV Imperial Dixieland East | Imperial | Solar | 2.0 MW | AES Distributed Energy |
| Crown Cooling Facility | Brawley | Solar | 1.0 MW | Five Crowns Inc |
| Usg 1 | El Centro | Solar | 1.0 MW | ZGlobal Inc |
| Usg 2 | El Centro | Solar | 1.0 MW | ZGlobal Inc |
Imperial County, California has 73 power plants totaling 4,558 MW of nameplate capacity. Solar is the dominant fuel source at 45% of installed capacity, followed by Geothermal (17%) and Natural Gas (12%). The largest facility is El Centro Hybrid at 388 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Imperial County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.