Sol Orchard El Centro PV is a solar power plant in California with a nameplate capacity of 20.0 MW. It generates roughly 46.2k MWh per year — enough to power about 4,401 average U.S. homes.
Its capacity factor of 26% reflects intermittent or peaking operation.
Run flat out every hour of the year, Sol Orchard El Centro PV could make 175.2k MWh. In 2023 it made 46.2k MWh — the same as running at full power 26 hours in every 100.
Peaking or variableCapacity factor 26%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 485 E. Villa Avenue |
|---|---|
| City | El Centro |
| County | Imperial County |
| State | California |
| ZIP | 92243 |
| Coordinates | 32.80333, -115.54639 |
| Operator | Sol Orchard Imperial 1, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| ECPV | Solar Photovoltaic | Solar | 20.0 MW | Operating | 2013 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Imperial Irrigation District |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.