Electric generating plantEIA plant no. 61683

Usg 2

Type
Solar Photovoltaic
Nameplate capacity
1.0 MW
Units
1
In service since
2015
Operator
ZGlobal Inc
Location
El Centro, Imperial County, California
Rated 1777th largest in California · 13806th of 14,761 in the U.S. · by nameplate

Usg 2 is a solar power plant in California with a nameplate capacity of 1.0 MW. It generates roughly 1.6k MWh per year — enough to power about 155 average U.S. homes.

Its capacity factor of 19% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Usg 2 could make 8.8k MWh. In 2023 it made 1.6k MWh — the same as running at full power 19 hours in every 100.

Nameplate, full year8.8k MWh1.0 MW × 8,760 hours
Actually generated1.6k MWhEPA eGRID, 2023 · ≈155 homes

Peaking or variableCapacity factor 19%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolarBiomassGeothermalBattery Storage

Location

Address3810 W. Evan Hewes Hwy
CityEl Centro
CountyImperial County
StateCalifornia
ZIP92243
Coordinates32.79040, -115.86321
OperatorZGlobal Inc

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
USG2Solar PhotovoltaicSolar1.0 MWOperating2015

Ownership

OwnerLocationShare
Green Light FIT 2, LLCFolsom, CA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityImperial Irrigation District

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Imperial County

View all plants in Imperial County →

Explore more