1471st largest plant in California · 11698th nationally
Chambers 4 - Eastvale Dca2 is a solar power plant in California with a nameplate capacity of 1.5 MW.
| Plant Name | Chambers 4 - Eastvale Dca2 |
|---|---|
| Operator | Mn8 Energy Llc |
| City | Eastvale |
| County | Riverside County |
| State | California |
| ZIP | 91752 |
| Coordinates | 33.99347, -117.55391 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | Solar | 1.5 MW | Operating | 2018 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.