IT is a data center in Riverside, Riverside County, California. Its power comes off the California grid (California ISO), which runs on 43% natural gas, 20% solar and 14% hydroelectric.
This data centerOther data centersPower plants (colored by fuel)
| County | Riverside County, California |
|---|---|
| Coordinates | 33.91029, -117.50302 |
| On OpenStreetMap | node/11924506303 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's California grid region, and the county's largest utility is on the California ISO grid. In 2023, the region's electricity was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear.
Each megawatt-hour carried about 426 lb of CO₂, 44% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Southern California Edison Co | 23.1¢ | 20.6¢ |
| Imperial Irrigation District | 18.2¢ | 20.8¢ |
| City of Riverside - (CA) | 19.1¢ | 14.7¢ |
| City of Moreno Valley - (CA) | 25.3¢ | 23.8¢ |
| City of Corona - (CA) | 14.1¢ | 11.6¢ |
| WAPA-- Western Area Power Administration | 4.6¢ | 2.9¢ |
Utilities that report serving Riverside County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Riverside RWQCP Fuel Cell | Biomass | 1.4 MW | 4.5 mi |
| Riverside Energy Resource Center | Natural Gas | 196 MW | 4.7 mi |
| Lake Mathews | Hydroelectric | 4.9 MW | 4.7 mi |
| Temescal | Hydroelectric | 2.9 MW | 5.3 mi |
| Temescal Canyon RV, LLC | Solar | 1.5 MW | 5.8 mi |
| Clearwater Power Plant | Natural Gas | 49.0 MW | 6.2 mi |
| Chambers 4 - Eastvale DCA2 | Solar | 1.5 MW | 6.4 mi |
| Chambers 4 - Eastvale LGB3 | Solar | 2.4 MW | 6.7 mi |
| Corona | Hydroelectric | 2.9 MW | 7.1 mi |
| Mira Loma Peaker | Natural Gas | 49.8 MW | 7.3 mi |
The largest power plant within 50 miles is Haynes, a 1,739 MW natural gas plant 36 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.