Electric generating plantEIA plant no. 57507

CO- CSU- Fort Collins II

Type
Solar Photovoltaic
Nameplate capacity
3.0 MW
Units
1
In service since
2010
Operator
RV CSU Power II LLC
Location
Fort Collins, Larimer County, Colorado
Rated 201st largest in Colorado · 9893rd of 14,761 in the U.S. · by nameplate

CO- CSU- Fort Collins II is a solar power plant in Colorado with a nameplate capacity of 3.0 MW. It generates roughly 2.7k MWh per year — enough to power about 260 average U.S. homes.

Its capacity factor of 10% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, CO- CSU- Fort Collins II could make 26.3k MWh. In 2023 it made 2.7k MWh — the same as running at full power 10 hours in every 100.

Nameplate, full year26.3k MWh3.0 MW × 8,760 hours
Actually generated2.7k MWhEPA eGRID, 2023 · ≈260 homes

Peaking or variableCapacity factor 10%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

CoalHydroelectricSolar

Location

Address3841 LaPorte Avenue
CityFort Collins
CountyLarimer County
StateColorado
ZIP80521
Coordinates40.59284, -105.14710
OperatorRV CSU Power II LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
CSUIISolar PhotovoltaicSolar3.0 MWOperating2010

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company of Colorado