426th largest plant in Minnesota · 12057th nationally
Cornillie 2 Community (Csg) is a solar power plant in Minnesota with a nameplate capacity of 1.4 MW. It generates roughly 1.5k MWh per year — enough to power about 144 average U.S. homes.
Its capacity factor of 12% reflects intermittent or peaking operation.
| Plant Name | Cornillie 2 Community (Csg) |
|---|---|
| Operator | Cornillie 2 Community Solar Llc |
| City | North Branch |
| County | Chisago County |
| State | Minnesota |
| ZIP | 55056 |
| Coordinates | 45.45942, -92.89476 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| CORN | Solar Photovoltaic | Solar | 1.4 MW | Operating | 2021 |
| NERC Region | MRO |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.