Electric generating plantEIA plant no. 52147

CP Kelco San Diego Plant

Type
Natural Gas Fired Combustion Turbine
Nameplate capacity
29.2 MW
Units
3
In service since
1983
Operator
CP Kelco US Inc.
Location
San Diego, San Diego County, California
Rated 585th largest in California · 4617th of 14,761 in the U.S. · by nameplate

CP Kelco San Diego Plant is a natural gas power plant in California with a nameplate capacity of 29.2 MW. It generates roughly 110.5k MWh per year — enough to power about 10,522 average U.S. homes.

Its capacity factor of 43% puts it in the middle range — running steadily but not full-time. At 658 lb CO₂/MWh, its emission rate sits below the national grid average of roughly 800 lb/MWh.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, CP Kelco San Diego Plant could make 255.8k MWh. In 2023 it made 110.5k MWh — the same as running at full power 43 hours in every 100.

Nameplate, full year255.8k MWh29.2 MW × 8,760 hours
Actually generated110.5k MWhEPA eGRID, 2023 · ≈10,522 homes

Mid-meritCapacity factor 43%. It runs much of the time, but not all of it.

How it works

A combustion turbine (“peaker”) burning natural gas

airnatural gas1compressor squeezes air2fuel burns3hot gas spins turbine4generator
  1. A compressor at the front squeezes outside air.
  2. natural gas burns in that compressed air.
  3. The hot, expanding gas spins the turbine — the same idea as a jet engine.
  4. The turbine turns a generator; exhaust leaves through the stack.

Why the numbers look like this: a combustion turbine can go from cold to full power in well under an hour, often minutes, so grid operators call on these plants for the few hottest or coldest hours of the year. A low capacity factor here is the job description, not a failure.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address2025 E Harbor Dr
CitySan Diego
CountySan Diego County
StateCalifornia
ZIP92113
Coordinates32.69470, -117.14360
OperatorCP Kelco US Inc.

Generators (3)

IDTechnologyFuelNameplate capacityStatusOnline
GEN2Natural Gas Fired Combustion TurbineNatural Gas10.0 MWOperating1983
GEN3Natural Gas Fired Combustion TurbineNatural Gas10.0 MWOut of Service1983
GEN1Natural Gas Fired Combustion TurbineNatural Gas9.2 MWOperating1983

Emissions (annual)

CO₂36.4k metric tons
SO₂1 metric tons
NOₓ100 metric tons
CO₂ Rate658 lb/MWh
This plant658 lb/MWhU.S. grid average800 lb/MWhNatural gas combined-cycle average900 lb/MWhCoal plant average2,100 lb/MWh

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Natural Gas plants

Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.

Other plants in San Diego County

View all plants in San Diego County →

Data centers near CP Kelco San Diego Plant

Data centerOperatorDistance
AT&T CenterAmerican Telephone & Telegraph3.8 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more