Crystal Farms Local Solar is a solar power plant in California with a nameplate capacity of 3.5 MW. It generates roughly 932 MWh per year — enough to power about 88 average U.S. homes.
Its capacity factor of 3% reflects intermittent or peaking operation.
Run flat out every hour of the year, Crystal Farms Local Solar could make 30.7k MWh. In 2023 it made 932 MWh — the same as running at full power 3 hours in every 100.
Peaking or variableCapacity factor 3%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | NE Corner of S Placer and W Ad |
|---|---|
| City | San Joaquin |
| County | Fresno County |
| State | California |
| ZIP | 93311 |
| Coordinates | 36.63381, -120.17710 |
| Operator | Agilitas Energy, Inc. |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| CRYPV | Solar Photovoltaic | Solar | 3.5 MW | Operating | 2023 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.