Don A Campbell 1 Geothermal

♨ GeothermalIPP Non-CHP22 MW capacity

75th largest plant in Nevada · 4487th nationally

Don A Campbell 1 Geothermal is a geothermal power plant in Nevada with a nameplate capacity of 22.5 MW. It generates roughly 118.8k MWh per year — enough to power about 11,311 average U.S. homes.

Its capacity factor of 60% puts it in the middle range — running steadily but not full-time.

PeakingMid-meritBaseload0%40%80%100%60%
Mid-merit — steady but not full-time
Capacity23 MWnameplate
Annual Generation118.8k MWhEPA eGRID
Capacity Factor60%of theoretical max
Annual CO₂metric tons

Location

Plant NameDon A Campbell 1 Geothermal
OperatorOrni 47, Llc
CityGabbs
CountyMineral County
StateNevada
ZIP89420
Coordinates38.83667, -118.32389

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarGeothermal

Generators (1)

IDTechnologyFuelCapacityStatusOnline
1GeothermalGeothermal20.0 MWOperating2014

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Geothermal plants

Geothermal plants tap heat from underground reservoirs to spin steam turbines. They provide carbon-free baseload power with very high capacity factors, but they only work where hot rock is accessible — primarily in the western U.S.

Other plants in Mineral County

View all plants in Mineral County →

Explore more