Don A Campbell 2 Geothermal

♨ GeothermalIPP Non-CHP25 MW capacity

68th largest plant in Nevada · 4367th nationally

Don A Campbell 2 Geothermal is a geothermal power plant in Nevada with a nameplate capacity of 25.0 MW. It generates roughly 99.5k MWh per year — enough to power about 9,475 average U.S. homes.

Its capacity factor of 45% puts it in the middle range — running steadily but not full-time.

PeakingMid-meritBaseload0%40%80%100%45%
Mid-merit — steady but not full-time
Capacity25 MWnameplate
Annual Generation99.5k MWhEPA eGRID
Capacity Factor45%of theoretical max
Annual CO₂metric tons

Location

Plant NameDon A Campbell 2 Geothermal
OperatorOrni 37 Llc
CityLuning
CountyMineral County
StateNevada
ZIP89420
Coordinates38.83584, -118.32534

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarGeothermal

Generators (1)

IDTechnologyFuelCapacityStatusOnline
DAC2GGeothermalGeothermal20.0 MWOperating2015

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Geothermal plants

Geothermal plants tap heat from underground reservoirs to spin steam turbines. They provide carbon-free baseload power with very high capacity factors, but they only work where hot rock is accessible — primarily in the western U.S.