Electric generating plantEIA plant no. 56543

Eastridge Wind Project

Type
Onshore Wind Turbine
Nameplate capacity
10.4 MW
Units
1
In service since
2006
Operator
Eastridge Wind Project
Location
Porter, Murray County, Minnesota
Rated 137th largest in Minnesota · 6016th of 14,761 in the U.S. · by nameplate

Eastridge Wind Project is a wind power plant in Minnesota with a nameplate capacity of 10.4 MW. It generates roughly 20.0k MWh per year — enough to power about 1,903 average U.S. homes.

Its capacity factor of 22% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Eastridge Wind Project could make 91.1k MWh. In 2023 it made 20.0k MWh — the same as running at full power 22 hours in every 100.

Nameplate, full year91.1k MWh10.4 MW × 8,760 hours
Actually generated20.0k MWhEPA eGRID, 2023 · ≈1,903 homes

Peaking or variableCapacity factor 22%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolar

Location

Address401 Lone Tree Street
CityPorter
CountyMurray County
StateMinnesota
ZIP56280
Coordinates43.93580, -95.92220
OperatorEastridge Wind Project

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind10.4 MWOperating2006

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Murray County