Eland Solar & Storage Center, Phase 2 Hy is a solar power plant in California.
| Plant Name | Eland Solar & Storage Center, Phase 2 Hy |
|---|---|
| Operator | 69sv 8me Llc |
| City | Mojave |
| County | Kern County |
| State | California |
| ZIP | 93301 |
| Coordinates | 35.21670, -117.97700 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| 69SV8 | Solar Photovoltaic | Solar | 200 MW | Under Construction | — |
| 61169 | Batteries | Battery | 150 MW | Under Construction | — |
| Owner | Location | Share |
|---|---|---|
| Arevon Asset Management | Scottsdale, AZ | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | WECC |
|---|---|
| Balancing Authority | Los Angeles Department Of Water And Power |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.