Electric generating plantEIA plant no. 63859

Golden Field Solar III, LLC

Type
Solar Photovoltaic
Nameplate capacity
339 MW
Units
2
In service since
2020–2024
Operator
Golden Fields Solar III, LLC
Location
Rosamond, Kern County, California
Rated 64th largest in California · 983rd of 14,761 in the U.S. · by nameplate

Golden Field Solar III, LLC is a solar power plant in California with a nameplate capacity of 339 MW. It generates roughly 516.1k MWh per year — enough to power about 49,151 average U.S. homes.

Its capacity factor of 31% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Golden Field Solar III, LLC could make 1.7M MWh. In 2023 it made 516.1k MWh — the same as running at full power 31 hours in every 100.

Nameplate, full year1.7M MWh192 MW × 8,760 hours
Actually generated516.1k MWhEPA eGRID, 2023 · ≈49,151 homes

In 2023 its nameplate was 192 MW (EPA eGRID). EIA's current inventory (EIA-860M) lists 339 MW operating.

Peaking or variableCapacity factor 31%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Location

Address14874 Holiday Ave
CityRosamond
CountyKern County
StateCalifornia
ZIP93560
Coordinates34.84700, -118.39500
OperatorGolden Fields Solar III, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
RCTRSolar PhotovoltaicSolar192 MWOperating2020
RCBABatteriesBattery147 MWOperating2024

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator