Emerald Gardens Pki, Llc

☀ SolarIPP Non-CHP1 MW capacity

132nd largest plant in Connecticut · 11524th nationally

Emerald Gardens Pki, Llc is a solar power plant in Connecticut with a nameplate capacity of 1.6 MW. It generates roughly 2.2k MWh per year — enough to power about 207 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%16%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation2.2k MWhEPA eGRID
Capacity Factor16%of theoretical max
Annual CO₂metric tons

Location

Plant NameEmerald Gardens Pki, Llc
OperatorEmerald Gardens Pki, Llc
CityShelton
CountyFairfield County
StateConnecticut
ZIP06484
Coordinates41.27183, -73.12225

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolarBiomass

Generators (2)

IDTechnologyFuelCapacityStatusOnline
EPKI1Solar PhotovoltaicSolar0.8 MWOperating2021
EPKI2Solar PhotovoltaicSolar0.8 MWOperating2021

Ownership

OwnerLocationShare
Eg1 Pki Holdings, LlcHuntersville, NC10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionNPCC
Balancing AuthorityIso New England Inc.