Electric generating plantEIA plant no. 59393

Eubank Landfill Solar Array

Type
Solar Photovoltaic
Nameplate capacity
2.0 MW
Units
1
In service since
2013
Operator
Suncore Photovoltaics, Inc
Location
Albuquerque, Bernalillo County, New Mexico
Rated 152nd largest in New Mexico · 11103rd of 14,761 in the U.S. · by nameplate

Eubank Landfill Solar Array is a solar power plant in New Mexico with a nameplate capacity of 2.0 MW.

The 2.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address1660 Eubank Blvd SE
CityAlbuquerque
CountyBernalillo County
StateNew Mexico
ZIP87123
Coordinates35.04917, -106.53000
OperatorSuncore Photovoltaics, Inc

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
ESNM1Solar PhotovoltaicSolar2.0 MWOperating2013

Ownership

OwnerLocationShare
Emcore Solar New Mexico, LLCAlbuquerque, NM10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company of New Mexico

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Bernalillo County

View all plants in Bernalillo County →

Data centers near Eubank Landfill Solar Array

Data centerOperatorDistance
725Not recorded0.7 mi
HPCSandia National Laboratories0.7 mi
Southwest CyberportNot recorded5.0 mi
UNM Data CenterUNM5.5 mi
UNMH data center, AlbuquerqueUNMH5.8 mi
Molina Healthcare data center, AlbuquerqueMolina Healthcare6.2 mi
123 Centralbigbyte.cc7.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more