Electric generating plantEIA plant no. 66007

Flower Valley II

Type
Other Fossil
Nameplate capacity
101 MW
Units
1
In service since
2022
Operator
Flower Valley II
Location
Pecos, Reeves County, Texas
Rated 543rd largest in Texas · 2698th of 14,761 in the U.S. · by nameplate

Flower Valley II is a other fossil power plant in Texas with a nameplate capacity of 101 MW.

The 101 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Location

Address1739 Fm 2007
CityPecos
CountyReeves County
StateTexas
ZIP79772
Coordinates31.19729, -103.36177
OperatorFlower Valley II

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BABatteriesBattery101 MWOperating2022

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Other Fossil plants

Flower Valley II is a federally registered power generation facility in Texas.

Other plants in Reeves County

View all plants in Reeves County →

Data centers near Flower Valley II

Data centerOperatorDistance
Data centerNot recorded9.8 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map