Electric generating plantEIA plant no. 60837

Forest Lake Solar CSG

Type
Solar Photovoltaic
Nameplate capacity
5.0 MW
Units
1
In service since
2017
Operator
Forest Lake Holdco LLC
Location
Scandia, Washington County, Minnesota
Rated 196th largest in Minnesota · 7466th of 14,761 in the U.S. · by nameplate

Forest Lake Solar CSG is a solar power plant in Minnesota with a nameplate capacity of 5.0 MW. It generates roughly 6.4k MWh per year — enough to power about 612 average U.S. homes.

Its capacity factor of 15% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Forest Lake Solar CSG could make 43.8k MWh. In 2023 it made 6.4k MWh — the same as running at full power 15 hours in every 100.

Nameplate, full year43.8k MWh5.0 MW × 8,760 hours
Actually generated6.4k MWhEPA eGRID, 2023 · ≈612 homes

Peaking or variableCapacity factor 15%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricSolar

Location

Address10360 Scandia Trail N
CityScandia
CountyWashington County
StateMinnesota
ZIP55073
Coordinates45.25349, -92.89397
OperatorForest Lake Holdco LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
FORESSolar PhotovoltaicSolar5.0 MWOperating2017

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Washington County

View all plants in Washington County →

Data centers near Forest Lake Solar CSG

Data centerOperatorDistance
Encompass Minneapolis FacilityEncompass12.9 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more