Electric generating plantEIA plant no. 67302

Frederick Battery Storage

Type
Batteries
Nameplate capacity
7.8 MW
Units
1
In service since
2024
Operator
Frederick Energy Storage LLC
Location
Frederick, Weld County, Colorado
Rated 130th largest in Colorado · 6764th of 14,761 in the U.S. · by nameplate

Frederick Battery Storage is a battery storage power plant in Colorado with a nameplate capacity of 7.8 MW.

The 7.8 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address3833 Tipple Parkway
CityFrederick
CountyWeld County
StateColorado
ZIP80516
Coordinates40.10462, -104.98452
OperatorFrederick Energy Storage LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
FREBABatteriesBattery7.8 MWOperating2024

Ownership

OwnerLocationShare
AmerescoKnoxville, TN10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Weld County

View all plants in Weld County →

Data centers near Frederick Battery Storage

Data centerOperatorDistance
JPMorgan Chase data center, BroomfieldJPMorgan Chase8.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more