Electric generating plantEIA plant no. 64334

GD Glocester White Oak I, LLC

Type
Solar Photovoltaic
Nameplate capacity
1.8 MW
Units
1
In service since
2020
Operator
GD Glocester White Oak I, LLC
Location
Glocester, Providence County, Rhode Island
Rated 91st largest in Rhode Island · 12281st of 14,761 in the U.S. · by nameplate

GD Glocester White Oak I, LLC is a solar power plant in Rhode Island with a nameplate capacity of 1.8 MW. It generates roughly 2.5k MWh per year — enough to power about 237 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, GD Glocester White Oak I, LLC could make 15.8k MWh. In 2023 it made 2.5k MWh — the same as running at full power 16 hours in every 100.

Nameplate, full year15.8k MWh1.8 MW × 8,760 hours
Actually generated2.5k MWhEPA eGRID, 2023 · ≈237 homes

Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolarBiomass

Location

Address74 White Oak Lane
CityGlocester
CountyProvidence County
StateRhode Island
ZIP02857
Coordinates41.86154, -71.59624
OperatorGD Glocester White Oak I, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GDWHSolar PhotovoltaicSolar1.8 MWOperating2020

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Providence County

View all plants in Providence County →

Explore more