Electric generating plantEIA plant no. 67418

Geer Road Solar 1 CSG

Type
Solar Photovoltaic
Nameplate capacity
5.0 MW
Units
1
In service since
2025
Operator
AES Clean Energy
Location
Hudson Falls, Washington County, New York
Rated 308th largest in New York · 7466th of 14,761 in the U.S. · by nameplate

Geer Road Solar 1 CSG is a solar power plant in New York with a nameplate capacity of 5.0 MW.

The 5.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomass

Location

Address221 Geer Road
CityHudson Falls
CountyWashington County
StateNew York
ZIP12839
Coordinates43.35600, -73.56600
OperatorAES Clean Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GEER1Solar PhotovoltaicSolar5.0 MWOperating2025

Ownership

OwnerLocationShare
Geer Rd Solar 1 LLCHudson Falls, NY10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionNPCC
Balancing AuthorityNew York Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Washington County

View all plants in Washington County →

Explore more