Electric generating plantEIA plant no. 62992

Goose Pond Solar

Type
Solar Photovoltaic
Nameplate capacity
4.0 MW
Units
2
In service since
2020
Operator
LSE Dorado, LLC
Location
Southwick, Hampden County, Massachusetts
Rated 218th largest in Massachusetts · 9069th of 14,761 in the U.S. · by nameplate

Goose Pond Solar is a solar power plant in Massachusetts with a nameplate capacity of 4.0 MW. It generates roughly 7.0k MWh per year — enough to power about 670 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Goose Pond Solar could make 35.0k MWh. In 2023 it made 7.0k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year35.0k MWh4.0 MW × 8,760 hours
Actually generated7.0k MWhEPA eGRID, 2023 · ≈670 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolar

Location

Address63 Congamond Rd
CitySouthwick
CountyHampden County
StateMassachusetts
ZIP01077
Coordinates42.00770, -72.78070
OperatorLSE Dorado, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
GPNORSolar PhotovoltaicSolar2.0 MWOperating2020
GPSOUSolar PhotovoltaicSolar2.0 MWOperating2020

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.