Greene County Meter #1

☀ SolarIPP Non-CHP1 MW capacity

943rd largest plant in New York · 11524th nationally

Greene County Meter #1 is a solar power plant in New York with a nameplate capacity of 1.6 MW. It generates roughly 1.5k MWh per year — enough to power about 140 average U.S. homes.

Its capacity factor of 11% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%11%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation1.5k MWhEPA eGRID
Capacity Factor11%of theoretical max
Annual CO₂metric tons

Location

Plant NameGreene County Meter #1
OperatorTesla Inc.
CityCairo
CountyGreene County
StateNew York
ZIP12413
Coordinates42.29482, -74.00076

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV1Solar PhotovoltaicSolar1.6 MWOperating2018

Grid context

NERC RegionNPCC
Balancing AuthorityIso New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Greene County