Hwy 14 Holdco Solar CSG is a solar power plant in Minnesota with a nameplate capacity of 5.0 MW. It generates roughly 7.1k MWh per year — enough to power about 671 average U.S. homes.
Its capacity factor of 16% reflects intermittent or peaking operation.
Run flat out every hour of the year, Hwy 14 Holdco Solar CSG could make 43.8k MWh. In 2023 it made 7.1k MWh — the same as running at full power 16 hours in every 100.
Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 7647 Country Club Road W Byron |
|---|---|
| City | Byron |
| County | Olmsted County |
| State | Minnesota |
| ZIP | 55920 |
| Coordinates | 44.02185, -92.59219 |
| Operator | Hwy 14 Holdco, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| HWY14 | Solar Photovoltaic | Solar | 5.0 MW | Operating | 2017 |
| NERC Region | MRO |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Epic / Mayo Data Center | 4.8 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map