Electric generating plantEIA plant no. 60445

ID Solar

Type
Solar Photovoltaic
Nameplate capacity
40.0 MW
Units
1
In service since
2016
Operator
AES Distributed Energy
Location
Kuna, Ada County, Idaho
Rated 35th largest in Idaho · 4259th of 14,761 in the U.S. · by nameplate

ID Solar is a solar power plant in Idaho with a nameplate capacity of 40.0 MW. It generates roughly 91.7k MWh per year — enough to power about 8,731 average U.S. homes.

Its capacity factor of 26% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, ID Solar could make 350.4k MWh. In 2023 it made 91.7k MWh — the same as running at full power 26 hours in every 100.

Nameplate, full year350.4k MWh40.0 MW × 8,760 hours
Actually generated91.7k MWhEPA eGRID, 2023 · ≈8,731 homes

Peaking or variableCapacity factor 26%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Location

Address18106 South Cloverdale Road
CityKuna
CountyAda County
StateIdaho
ZIP83634
Coordinates43.44400, -116.33300
OperatorAES Distributed Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
INV1Solar PhotovoltaicSolar40.0 MWOperating2016

Grid context

NERC RegionWECC
Balancing AuthorityIdaho Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Ada County

View all plants in Ada County →

Data centers near ID Solar

Data centerOperatorDistance
Data center, BoiseNot recorded3.3 mi
Data center, BoiseNot recorded3.5 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map