Data center, Boise is a data center in Boise, Ada County, Idaho. It is mapped as 1 building covering about 8.5 acres (372,000 sq ft). Its power comes off the Northwest grid (Idaho Power), which runs on 39% hydroelectric, 25% natural gas and 16% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Ada County, Idaho |
|---|---|
| Coordinates | 43.46365, -116.27222 |
| On OpenStreetMap | way/1455915218 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Idaho Power grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.
Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Idaho Power Co | 9.2¢ | 8.2¢ |
Utilities that report serving Ada County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Orchard Ranch Solar | Solar | 20.0 MW | 0.9 mi |
| ID Solar | Solar | 40.0 MW | 3.3 mi |
| MC6 Hydro Facility | Hydroelectric | 2.3 MW | 4.4 mi |
| Kuna BESS | Battery Storage | 150 MW | 7.6 mi |
| Boise Bench BESS | Battery Storage | 150 MW | 8.8 mi |
| Mora Drop Hydroelectric Project | Hydroelectric | 1.7 MW | 10.1 mi |
| Barber Dam | Hydroelectric | 4.1 MW | 10.1 mi |
| Boise R Diversion | Hydroelectric | 3.3 MW | 10.3 mi |
| Lucky Peak Power Plant Project | Hydroelectric | 101 MW | 11.6 mi |
| Happy Valley Battery Storage | Battery Storage | 82.0 MW | 13.4 mi |
The largest power plant within 50 miles is Langley Gulch Power Plant, a 319 MW natural gas plant 41 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Data center, Boise | 7.1 ac | 0.2 mi |
Data centers in Idaho · Data centers in Ada County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.