Data Centers in Ada County, ID

2 data centers are mapped in Ada County, Idaho: 2 buildings covering about 15.6 acres (681,000 sq ft) of roof. The county is in EPA's Northwest grid region, whose electricity is 39% hydroelectric, 25% natural gas and 16% coal, at 631 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings2mapped footprints
Roof area16 acbuilding footprints
GridIdaho Powerlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Ada County

Data centerOperatorCityRoof area
Data center, BoiseOperator not recordedBoise8.5 ac
Data center, BoiseOperator not recordedBoise7.1 ac

What the grid here generates

Data centers in Ada County draw from the regional grid. In 2023, electricity in EPA's Northwest region was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind, at 631 lb of CO₂ per megawatt-hour, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Ada County

UtilityTypeGridBusiness rateIndustrial rate
Idaho Power CoInvestor OwnedIdaho Power9.2¢8.2¢

Utilities that report serving Ada County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Ada County

PlantFuelCapacity
Matrix Pleasant ValleySolar200 MW
Kuna BESSBattery Storage150 MW
Boise Bench BESSBattery Storage150 MW
Pleasant Valley Solar 2 ProjectSolar125 MW
Lucky Peak Power Plant ProjectHydroelectric101 MW
ID SolarSolar40.0 MW
Swan FallsHydroelectric27.2 MW
Orchard Ranch SolarSolar20.0 MW
Barber DamHydroelectric4.1 MW
Boise R DiversionHydroelectric3.3 MW
Hidden Hollow EnergyBiomass3.2 MW
MC6 Hydro FacilityHydroelectric2.3 MW
Mora Drop Hydroelectric ProjectHydroelectric1.7 MW

All power plants in Ada County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me