2 data centers are mapped in Ada County, Idaho: 2 buildings covering about 15.6 acres (681,000 sq ft) of roof. The county is in EPA's Northwest grid region, whose electricity is 39% hydroelectric, 25% natural gas and 16% coal, at 631 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Data center, Boise | Boise | 8.5 ac |
| Data center, Boise | Boise | 7.1 ac |
Data centers in Ada County draw from the regional grid. In 2023, electricity in EPA's Northwest region was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind, at 631 lb of CO₂ per megawatt-hour, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Idaho Power Co | 9.2¢ | 8.2¢ |
Utilities that report serving Ada County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Matrix Pleasant Valley | Solar | 200 MW |
| Kuna BESS | Battery Storage | 150 MW |
| Boise Bench BESS | Battery Storage | 150 MW |
| Pleasant Valley Solar 2 Project | Solar | 125 MW |
| Lucky Peak Power Plant Project | Hydroelectric | 101 MW |
| ID Solar | Solar | 40.0 MW |
| Swan Falls | Hydroelectric | 27.2 MW |
| Orchard Ranch Solar | Solar | 20.0 MW |
| Barber Dam | Hydroelectric | 4.1 MW |
| Boise R Diversion | Hydroelectric | 3.3 MW |
| Hidden Hollow Energy | Biomass | 3.2 MW |
| MC6 Hydro Facility | Hydroelectric | 2.3 MW |
| Mora Drop Hydroelectric Project | Hydroelectric | 1.7 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.