Electric generating plantEIA plant no. 61814

Kearsarge Concord II

Type
Solar Photovoltaic
Nameplate capacity
4.5 MW
Units
1
In service since
2017
Operator
Kearsarge Concord II LLC
Location
Concord, Middlesex County, Massachusetts
Rated 197th largest in Massachusetts · 8794th of 14,761 in the U.S. · by nameplate

Kearsarge Concord II is a solar power plant in Massachusetts with a nameplate capacity of 4.5 MW. It generates roughly 6.8k MWh per year — enough to power about 652 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Kearsarge Concord II could make 39.4k MWh. In 2023 it made 6.8k MWh — the same as running at full power 17 hours in every 100.

Nameplate, full year39.4k MWh4.5 MW × 8,760 hours
Actually generated6.8k MWhEPA eGRID, 2023 · ≈652 homes

Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBattery Storage

Location

Address214Y Main St.
CityConcord
CountyMiddlesex County
StateMassachusetts
ZIP01742
Coordinates42.44931, -71.42043
OperatorKearsarge Concord II LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
CIISolar PhotovoltaicSolar4.5 MWOperating2017

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.