Electric generating plantEIA plant no. 61917

Kearsarge Oppenheim CSG

Type
Solar Photovoltaic
Nameplate capacity
1.4 MW
Units
1
In service since
2018
Operator
Kearsarge Oppenheim LLC
Location
St. Johnsville, Fulton County, New York
Rated 1094th largest in New York · 13098th of 14,761 in the U.S. · by nameplate

Kearsarge Oppenheim CSG is a solar power plant in New York with a nameplate capacity of 1.4 MW. It generates roughly 2.1k MWh per year — enough to power about 204 average U.S. homes.

Its capacity factor of 18% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Kearsarge Oppenheim CSG could make 12.3k MWh. In 2023 it made 2.1k MWh — the same as running at full power 18 hours in every 100.

Nameplate, full year12.3k MWh1.4 MW × 8,760 hours
Actually generated2.1k MWhEPA eGRID, 2023 · ≈204 homes

Peaking or variableCapacity factor 18%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolarBiomass

Location

Address519 County Highway 151
CitySt. Johnsville
CountyFulton County
StateNew York
ZIP13452
Coordinates43.06022, -74.73642
OperatorKearsarge Oppenheim LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
OPPENSolar PhotovoltaicSolar1.4 MWOperating2018

Grid context

NERC RegionNPCC
Balancing AuthorityNew York Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Fulton County