Electric generating plantEIA plant no. 59325

Kings Mountain Energy Center

Type
Natural Gas Fired Combined Cycle
Nameplate capacity
544 MW
Units
2
In service since
2018
Operator
Carolina Power Partners, LLC
Location
Kings Mountain, Cleveland County, North Carolina
Rated 20th largest in North Carolina · 690th of 14,761 in the U.S. · by nameplate

Kings Mountain Energy Center is a natural gas power plant in North Carolina with a nameplate capacity of 544 MW. It generates roughly 3.4M MWh per year — enough to power about 321,685 average U.S. homes.

Its capacity factor of 71% puts it in the middle range — running steadily but not full-time. At 807 lb CO₂/MWh, its emission rate sits above the national grid average of roughly 800 lb/MWh.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Kings Mountain Energy Center could make 4.8M MWh. In 2023 it made 3.4M MWh — the same as running at full power 71 hours in every 100.

Nameplate, full year4.8M MWh544 MW × 8,760 hours
Actually generated3.4M MWhEPA eGRID, 2023 · ≈321,685 homes

Mid-meritCapacity factor 71%. It runs much of the time, but not all of it.

Month by month in 2025

100% of nameplate0Jan: 286.8k MWh (71% of capacity)JFeb: 269.3k MWh (74% of capacity)FMApr: 285.9k MWh (73% of capacity)AMay: 301.7k MWh (75% of capacity)MJun: 270.9k MWh (69% of capacity)JJul: 295.5k MWh (73% of capacity)JAug: 291.0k MWh (72% of capacity)ASep: 296.8k MWh (76% of capacity)SOct: 328.9k MWh (81% of capacity)ONov: 239.1k MWh (61% of capacity)NDec: 295.9k MWh (73% of capacity)D

Pale bars are each month's ceiling (544 MW nameplate × hours in the month). Filled bars are actual net generation reported to EIA Form 923.

How it works

A combined-cycle gas plant

air1gas turbine2exhaust heat makes steam3steam turbine4two generators
  1. A gas turbine burns natural gas in compressed air and drives a generator, like a jet engine bolted to the ground.
  2. Its exhaust is still hundreds of degrees hot, so instead of venting it, a heat-recovery boiler uses it to make steam.
  3. That steam spins a second turbine and a second generator.
  4. Both feed the grid — two cycles from one fuel bill.

Why the numbers look like this: reusing the exhaust heat is why combined-cycle plants turn roughly half or more of their fuel's energy into electricity, against about a third for a simple steam or turbine plant. Cheap to run, they usually sit in the middle of the dispatch order: on most days, off on some nights.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolar

Location

Address181 Gage Rd.
CityKings Mountain
CountyCleveland County
StateNorth Carolina
ZIP28086
Coordinates35.20250, -81.36306
OperatorCarolina Power Partners, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
KMEC1Natural Gas Fired Combined CycleNatural Gas310 MWOperating2018
KMEC2Natural Gas Fired Combined CycleNatural Gas234 MWOperating2018

Emissions (annual)

CO₂1.4M metric tons
SO₂7 metric tons
NOₓ74 metric tons
CO₂ Rate807 lb/MWh
U.S. grid average800 lb/MWhThis plant806 lb/MWhNatural gas combined-cycle average900 lb/MWhCoal plant average2,100 lb/MWh

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas

About Natural Gas plants

Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.

Other plants in Cleveland County

View all plants in Cleveland County →

Data centers near Kings Mountain Energy Center

Data centerOperatorDistance
T5 Charlotte CampusNot recorded3.8 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map