Lindstrom Solar CSG is a solar power plant in Minnesota with a nameplate capacity of 3.0 MW. It generates roughly 5.3k MWh per year — enough to power about 504 average U.S. homes.
Its capacity factor of 20% reflects intermittent or peaking operation.
Run flat out every hour of the year, Lindstrom Solar CSG could make 26.3k MWh. In 2023 it made 5.3k MWh — the same as running at full power 20 hours in every 100.
Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 25501 Olinda Trail |
|---|---|
| City | Lindstrom |
| County | Chisago County |
| State | Minnesota |
| ZIP | 55045 |
| Coordinates | 45.31989, -92.79660 |
| Operator | Geronimo Power |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| LIND1 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2018 |
| LIND2 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2018 |
| LIND3 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2018 |
| Owner | Location | Share |
|---|---|---|
| Nordic Solar, LLC | Edina, MN | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | MRO |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.