Electric generating plantEIA plant no. 60208

Long Farm 46 Solar, LLC

Type
Solar Photovoltaic
Nameplate capacity
5.0 MW
Units
1
In service since
2016
Operator
Deriva Energy
Location
Garysburg, Northampton County, North Carolina
Rated 217th largest in North Carolina · 7466th of 14,761 in the U.S. · by nameplate

Long Farm 46 Solar, LLC is a solar power plant in North Carolina with a nameplate capacity of 5.0 MW. It generates roughly 9.1k MWh per year — enough to power about 869 average U.S. homes.

Its capacity factor of 21% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Long Farm 46 Solar, LLC could make 43.8k MWh. In 2023 it made 9.1k MWh — the same as running at full power 21 hours in every 100.

Nameplate, full year43.8k MWh5.0 MW × 8,760 hours
Actually generated9.1k MWhEPA eGRID, 2023 · ≈869 homes

Peaking or variableCapacity factor 21%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilHydroelectricSolarBiomass

Location

Address6738 NC-46 Highway
CityGarysburg
CountyNorthampton County
StateNorth Carolina
ZIP27831
Coordinates36.46702, -77.61796
OperatorDeriva Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar5.0 MWOperating2016

Ownership

OwnerLocationShare
Long Farm 46 Solar, LLCCharlotte, NC10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionSERC
Balancing AuthorityPJM Interconnection, LLC