Marathon Solar Farm II LLC North is a solar power plant in New York with a nameplate capacity of 2.9 MW. It generates roughly 4.2k MWh per year — enough to power about 395 average U.S. homes.
Its capacity factor of 16% reflects intermittent or peaking operation.
Run flat out every hour of the year, Marathon Solar Farm II LLC North could make 25.4k MWh. In 2023 it made 4.2k MWh — the same as running at full power 16 hours in every 100.
Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 7594 Roberts St |
|---|---|
| City | Canastota |
| County | Madison County |
| State | New York |
| ZIP | 13032 |
| Coordinates | 43.08320, -75.73510 |
| Operator | Distributed Solar Development, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| P4471 | Solar Photovoltaic | Solar | 2.9 MW | Operating | 2020 |
| NERC Region | NPCC |
|---|---|
| Balancing Authority | New York Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.