Electric generating plantEIA plant no. 61198

Merck - Upper Gwynedd Solar Array

Type
Solar Photovoltaic
Nameplate capacity
1.5 MW
Units
1
In service since
2011
Operator
Merck - Upper Gwynedd Solar Array
Location
North Wales, Montgomery County, Pennsylvania
Rated 256th largest in Pennsylvania · 12718th of 14,761 in the U.S. · by nameplate

Merck - Upper Gwynedd Solar Array is a solar power plant in Pennsylvania with a nameplate capacity of 1.5 MW. It generates roughly 1.8k MWh per year — enough to power about 174 average U.S. homes.

Its capacity factor of 14% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Merck - Upper Gwynedd Solar Array could make 13.1k MWh. In 2023 it made 1.8k MWh — the same as running at full power 14 hours in every 100.

Nameplate, full year13.1k MWh1.5 MW × 8,760 hours
Actually generated1.8k MWhEPA eGRID, 2023 · ≈174 homes

Peaking or variableCapacity factor 14%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasOilSolarBiomass

Location

Address351 North Sumneytown Pike
CityNorth Wales
CountyMontgomery County
StatePennsylvania
ZIP19454
Coordinates40.21540, -75.28309
OperatorMerck - Upper Gwynedd Solar Array

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SA-1Solar PhotovoltaicSolar1.5 MWOperating2011

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Montgomery County

View all plants in Montgomery County →

Data centers near Merck - Upper Gwynedd Solar Array

Data centerOperatorDistance
Lumen NorristownLumen Technologies9.0 mi
DāStor: 3400 Horizon DriveNot recorded9.3 mi
TierPoint Valley ForgeTierPoint9.7 mi
Flexential Philadelphia - CollegevilleFlexential11.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more