TierPoint Valley Forge

TierPoint Valley Forge is a data center in Oaks, Montgomery County, Pennsylvania. It is mapped as 1 building covering about 1.4 acres (62,000 sq ft). Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.

OperatorTierPointas mapped
Roof area1.4 ac1 building
Grid CO₂594 lbper MWh, RFCE region
Nearest plant3.5 miPickering Solar

Location

This data centerOther data centersPower plants (colored by fuel)

CountyMontgomery County, Pennsylvania
Coordinates40.12203, -75.42084
On OpenStreetMapway/1109881281

What powers TierPoint Valley Forge

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.

Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Montgomery County

UtilityTypeGridBusiness rateIndustrial rate
FirstEnergy Pennsylvania Electric CoInvestor OwnedPJM Interconnection15.2¢8.9¢
PECO Energy CoInvestor OwnedPJM Interconnection11.8¢7.6¢
PPL Electric Utilities CorpInvestor OwnedPJM Interconnection13.9¢10.9¢

Utilities that report serving Montgomery County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Pickering SolarSolar1.5 MW3.5 mi
Reworld Plymouth LLCBiomass32.1 MW6.1 mi
IKEA Conshohocken Rooftop PV SystemSolar1.0 MW6.3 mi
West Point (PA)Natural Gas90.6 MW9.2 mi
Merck - Upper Gwynedd Solar ArraySolar1.5 MW9.7 mi
Spring HouseNatural Gas3.8 MW10.7 mi
LimerickNuclear2,277 MW11.3 mi
500 Virginia SolarSolar1.0 MW12.2 mi
Hatfield PA BTMOil2.7 MW12.7 mi
Moser Generating StationOil63.6 MW13.1 mi

The largest power plant within 50 miles is PSEG Salem Generating Station, a 2,382 MW nuclear plant 46 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Lumen NorristownLumen Technologies0.8 ac0.7 mi
Flexential Philadelphia - CollegevilleFlexential2.5 ac3.6 mi
DāStor: 3400 Horizon DriveOperator not recorded—4.9 mi

More

Data centers in Pennsylvania · Data centers in Montgomery County · All TierPoint data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me