4 data centers are mapped in Montgomery County, Pennsylvania: 4 buildings covering about 4.7 acres (206,000 sq ft) of roof. Operators include Flexential, Lumen Technologies, TierPoint. The county is in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Flexential Philadelphia - Collegeville | Collegeville | 2.5 ac |
| TierPoint Valley Forge | Oaks | 1.4 ac |
| Lumen Norristown | Eagleville | 0.8 ac |
| DāStor: 3400 Horizon Drive | King of Prussia | — |
Data centers in Montgomery County draw from the regional grid. In 2023, electricity in EPA's Mid-Atlantic region was 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| FirstEnergy Pennsylvania Electric Co | 15.2¢ | 8.9¢ |
| PECO Energy Co | 11.8¢ | 7.6¢ |
| PPL Electric Utilities Corp | 13.9¢ | 10.9¢ |
Utilities that report serving Montgomery County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Limerick | Nuclear | 2,277 MW |
| West Point (PA) | Natural Gas | 90.6 MW |
| Moser Generating Station | Oil | 63.6 MW |
| Reworld Plymouth LLC | Biomass | 32.1 MW |
| Spring House | Natural Gas | 3.8 MW |
| Hatfield PA BTM | Oil | 2.7 MW |
| Merck - Upper Gwynedd Solar Array | Solar | 1.5 MW |
| 500 Virginia Solar | Solar | 1.0 MW |
| IKEA Conshohocken Rooftop PV System | Solar | 1.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.