Electric generating plantEIA plant no. 59231

Michelangelo Wind 1 LLC

Type
Onshore Wind Turbine
Nameplate capacity
3.0 MW
Units
1
In service since
2017
Operator
Novis Renewables, LLC
Location
Huxley, Story County, Iowa
Rated 225th largest in Iowa · 9893rd of 14,761 in the U.S. · by nameplate

Michelangelo Wind 1 LLC is a wind power plant in Iowa with a nameplate capacity of 3.0 MW. It generates roughly 8.6k MWh per year — enough to power about 816 average U.S. homes.

Its capacity factor of 33% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Michelangelo Wind 1 LLC could make 26.3k MWh. In 2023 it made 8.6k MWh — the same as running at full power 33 hours in every 100.

Nameplate, full year26.3k MWh3.0 MW × 8,760 hours
Actually generated8.6k MWhEPA eGRID, 2023 · ≈816 homes

Peaking or variableCapacity factor 33%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalOilWindSolarBiomass

Location

Address535th St & Hwy 210
CityHuxley
CountyStory County
StateIowa
ZIP50124
Coordinates41.88100, -93.62306
OperatorNovis Renewables, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WT1Onshore Wind TurbineWind3.0 MWOperating2017

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Story County

View all plants in Story County →

Data centers near Michelangelo Wind 1 LLC

Data centerOperatorDistance
Meta data center, BerwickMeta15.4 mi
Facebook Altoona Data Center 5Meta15.5 mi
Facebook Altoona Data Center 4Meta15.7 mi
Facebook Altoona Data Center 3Meta16.0 mi
Facebook Altoona Data Center 1Meta16.0 mi
Facebook Altoona Data Center 2Meta16.0 mi
Lightedge Des Moines 1Not recorded17.1 mi
Lightedge Des Moines 2Not recorded17.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more