Lightedge Des Moines 2

Lightedge Des Moines 2 is a data center in Altoona, Polk County, Iowa. It is mapped as 1 building covering about 1.3 acres (56,000 sq ft). Its power comes off the Upper Midwest grid (MISO (Midcontinent ISO)), which runs on 38% wind, 35% coal and 13% natural gas.

OperatorOperator not recordedas mapped
Roof area1.3 ac1 building
Grid CO₂920 lbper MWh, MROW region
Nearest plant7.0 miMetro Methane Recovery Fa…

Location

This data centerOther data centersPower plants (colored by fuel)

Address1401 Northridge Circle, Altoona IA 50009
CountyPolk County, Iowa
Coordinates41.66685, -93.45612
Websitewww.lightedge.com/des-moines-data-center/
On OpenStreetMapway/1202051225

What powers Lightedge Des Moines 2

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upper Midwest grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 38% wind, 35% coal, 13% natural gas and 8% nuclear.

Each megawatt-hour carried about 920 lb of CO₂, 20% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Wind 38%Coal 35%Natural Gas 13%Nuclear 8%Hydroelectric 4%

Share of electricity generated in EPA's Upper Midwest grid region (MROW) in 2023, from eGRID. 241 TWh from 1,363 plants.

Utilities that serve Polk County

UtilityTypeGridBusiness rateIndustrial rate
MidAmerican Energy CoInvestor OwnedMISO (Midcontinent ISO)8.4¢6.0¢
Interstate Power and Light CoInvestor OwnedMISO (Midcontinent ISO)13.4¢8.2¢
Midland Power CoopCooperativeMISO (Midcontinent ISO)11.3¢7.0¢
Consumers Energy Coop - (IA)CooperativeMISO (Midcontinent ISO)11.8¢6.5¢

Utilities that report serving Polk County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Metro Methane Recovery FacilityBiomass11.2 MW7.0 mi
Archer Daniels Midland Des MoinesCoal7.9 MW7.2 mi
Anderson EricksonOil2.0 MW7.7 mi
Des Moines Wastewater Reclamation FacBiomass2.8 MW8.3 mi
Pleasant HillNatural Gas180 MW8.3 mi
Greater Des MoinesNatural Gas576 MW8.5 mi
River HillsNatural Gas128 MW10.0 mi
Sycamore (IA)Natural Gas158 MW11.4 mi
Michelangelo Wind 1 LLCWind3.0 MW17.1 mi
IndianolaOil40.9 MW21.9 mi

The largest power plant within 50 miles is Marshalltown Generating Station, a 709 MW natural gas plant 40 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Lightedge Des Moines 1Operator not recorded0.7 ac0.1 mi
Facebook Altoona Data Center 3Meta8.6 ac2.6 mi
Facebook Altoona Data Center 2Meta7.0 ac2.7 mi
Meta data center, BerwickMeta25 ac2.7 mi
Facebook Altoona Data Center 1Meta7.2 ac3.0 mi
Facebook Altoona Data Center 4Meta14 ac3.1 mi
Facebook Altoona Data Center 5Meta14 ac3.1 mi

More

Data centers in Iowa · Data centers in Polk County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me