Milford Wind Corridor Stage II LLC is a wind power plant in Utah with a nameplate capacity of 102 MW. It generates roughly 158.9k MWh per year — enough to power about 15,132 average U.S. homes.
Its capacity factor of 18% reflects intermittent or peaking operation.
Run flat out every hour of the year, Milford Wind Corridor Stage II LLC could make 893.5k MWh. In 2023 it made 158.9k MWh — the same as running at full power 18 hours in every 100.
Peaking or variableCapacity factor 18%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 2390 East First Wind Road |
|---|---|
| City | Milford |
| County | Beaver County |
| State | Utah |
| ZIP | 84751 |
| Coordinates | 38.58523, -112.93100 |
| Operator | Milford Wind Corridor Stage II LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Wind | 102 MW | Operating | 2011 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Los Angeles Department of Water and Power |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.