Electric generating plantEIA plant no. 63465

Minke Solar

Type
Solar Photovoltaic
Nameplate capacity
2.2 MW
Units
1
In service since
2020
Operator
SunStrong Management
Location
Molalla, Clackamas County, Oregon
Rated 233rd largest in Oregon · 10933rd of 14,761 in the U.S. · by nameplate

Minke Solar is a solar power plant in Oregon with a nameplate capacity of 2.2 MW. It generates roughly 2.9k MWh per year — enough to power about 280 average U.S. homes.

Its capacity factor of 15% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Minke Solar could make 19.3k MWh. In 2023 it made 2.9k MWh — the same as running at full power 15 hours in every 100.

Nameplate, full year19.3k MWh2.2 MW × 8,760 hours
Actually generated2.9k MWhEPA eGRID, 2023 · ≈280 homes

Peaking or variableCapacity factor 15%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricSolarBattery Storage

Location

Address11912 South Barnards Rd
CityMolalla
CountyClackamas County
StateOregon
ZIP97038
Coordinates45.17233, -122.62266
OperatorSunStrong Management

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PGR20Solar PhotovoltaicSolar2.2 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityPortland General Electric Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Clackamas County

View all plants in Clackamas County →

Data centers near Minke Solar

Data centerOperatorDistance
Siemens EDA - HDC / Data CenterSiemens Digital Industries Software12.3 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more