Siemens EDA - HDC / Data Center is a data center run by Siemens Digital Industries Software in Wilsonville, Clackamas County, Oregon. It is mapped as 1 building covering about 24,700 sq ft. Its power comes off the Northwest grid (Portland General Electric), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorSiemens Digital Industries Softwareas mapped
Roof area0.6 ac1 building
Grid CO₂631 lbper MWh, NWPP region
Nearest plant1.8 miCoffee Creek BESS

Location

This data centerOther data centersPower plants (colored by fuel)

Address27930 Southwest Parkway Avenue, Wilsonville OR 97070
CountyClackamas County, Oregon
Coordinates45.31871, -122.76579
On OpenStreetMapway/480762078

What powers Siemens EDA - HDC / Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Portland General Electric grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Clackamas County

UtilityTypeGridBusiness rateIndustrial rate
Portland General Electric CoInvestor OwnedPortland General Electric13.9¢8.8¢
Bonneville Power AdministrationFederalBonneville Power Administration4.2¢—

Utilities that report serving Clackamas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Coffee Creek BESSBattery Storage17.0 MW1.8 mi
Baldock Solar HighwaySolar1.4 MW3.4 mi
SulusSolar25Solar2.2 MW4.3 mi
SSD Marion 6, LLCSolar2.0 MW4.9 mi
Durham AWTFBiomass1.6 MW5.7 mi
SullivanHydroelectric15.4 MW7.5 mi
OR - Solops - SPI 18 - DoverSolar2.0 MW8.8 mi
OR - Green Key - Buckner CSGSolar2.5 MW11.2 mi
BristolSolarSolar3.0 MW11.7 mi
Minke SolarSolar2.2 MW12.3 mi

The largest power plant within 50 miles is Bonneville, a 1,162 MW hydroelectric plant 46 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Oregon · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me