Electric generating plantEIA plant no. 10766

NE Renewable Power West Enfield

Type
Wood/Wood Waste Biomass
Nameplate capacity
27.5 MW
Units
1
In service since
1987
Operator
Stored Solar J&WE
Location
West Enfield, Penobscot County, Maine
Rated 38th largest in Maine · 4668th of 14,761 in the U.S. · by nameplate

NE Renewable Power West Enfield is a biomass power plant in Maine with a nameplate capacity of 27.5 MW. It generates roughly 13.5k MWh per year — enough to power about 1,281 average U.S. homes.

Its capacity factor of 6% reflects intermittent or peaking operation. At 11 lb CO₂/MWh, its emission rate sits below the national grid average of roughly 800 lb/MWh.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, NE Renewable Power West Enfield could make 240.9k MWh. In 2023 it made 13.5k MWh — the same as running at full power 6 hours in every 100.

Nameplate, full year240.9k MWh27.5 MW × 8,760 hours
Actually generated13.5k MWhEPA eGRID, 2023 · ≈1,281 homes

Peaking or variableCapacity factor 6%. It runs only part of the time — when demand is high, or when the wind or sun allows.

Month by month in 2025

100% of nameplate0Jan: 10.6k MWh (52% of capacity)JFeb: 10.2k MWh (55% of capacity)FMar: 7.3k MWh (36% of capacity)MApr: 99 MWh (0% of capacity)AMJJASONov: 2.3k MWh (11% of capacity)NDec: 12.1k MWh (59% of capacity)D

Pale bars are each month's ceiling (27.5 MW nameplate × hours in the month). Filled bars are actual net generation reported to EIA Form 923.

How it works

A steam plant burning wood

wood insteamwater returns1boiler burns wood2steam spins turbine3generator4cooling condenses steam
  1. A boiler burns wood to turn water into high-pressure steam.
  2. The steam pushes through a turbine, spinning it thousands of times a minute.
  3. The turbine's shaft turns a generator, which sends power to the grid.
  4. Spent steam is cooled back into water — by a cooling tower, a lake or a river — and pumped back to the boiler.

Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolarBiomass

Location

AddressRoute 2
CityWest Enfield
CountyPenobscot County
StateMaine
ZIP04493
Coordinates45.25370, -68.62792
OperatorStored Solar J&WE

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GEN1Wood/Wood Waste BiomassWood/Wood Waste27.5 MWOperating1987

Emissions (annual)

CO₂76 metric tons
SO₂3 metric tons
NOₓ14 metric tons
CO₂ Rate11 lb/MWh
This plant11 lb/MWhU.S. grid average800 lb/MWhNatural gas combined-cycle average900 lb/MWhCoal plant average2,100 lb/MWh

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Biomass plants

Biomass plants burn wood, agricultural waste, or methane from landfills to generate steam and electricity. They are considered carbon-neutral over long timescales when fuel is sustainably sourced, but they produce particulate emissions similar to coal.

Other plants in Penobscot County

View all plants in Penobscot County →

Explore more