Electric generating plantEIA plant no. 59222

Passadumkeag Windpark LLC

Type
Onshore Wind Turbine
Nameplate capacity
42.9 MW
Units
1
In service since
2016
Operator
Southern Power Co
Location
Greenbush, Penobscot County, Maine
Rated 29th largest in Maine · 4208th of 14,761 in the U.S. · by nameplate

Passadumkeag Windpark LLC is a wind power plant in Maine with a nameplate capacity of 42.9 MW. It generates roughly 129.9k MWh per year — enough to power about 12,375 average U.S. homes.

Its capacity factor of 35% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Passadumkeag Windpark LLC could make 375.8k MWh. In 2023 it made 129.9k MWh — the same as running at full power 35 hours in every 100.

Nameplate, full year375.8k MWh42.9 MW × 8,760 hours
Actually generated129.9k MWhEPA eGRID, 2023 · ≈12,375 homes

Peaking or variableCapacity factor 35%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolarBiomass

Location

Address369 Greenfield Rd
CityGreenbush
CountyPenobscot County
StateMaine
ZIP04418
Coordinates45.07000, -68.21000
OperatorSouthern Power Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
Q357Onshore Wind TurbineWind42.9 MWOperating2016

Ownership

OwnerLocationShare
Passadumkeag Windpark LLCAtlanta, GA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Penobscot County

View all plants in Penobscot County →

Explore more