Electric generating plantEIA plant no. 60098

Onondaga County - Oak Orchard WWTP

Type
Solar Photovoltaic
Nameplate capacity
2.0 MW
Units
1
In service since
2017
Operator
Tesla Inc.
Location
Clay, Onondaga County, New York
Rated 853rd largest in New York · 11103rd of 14,761 in the U.S. · by nameplate

Onondaga County - Oak Orchard WWTP is a solar power plant in New York with a nameplate capacity of 2.0 MW. It generates roughly 2.2k MWh per year — enough to power about 212 average U.S. homes.

Its capacity factor of 13% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Onondaga County - Oak Orchard WWTP could make 17.5k MWh. In 2023 it made 2.2k MWh — the same as running at full power 13 hours in every 100.

Nameplate, full year17.5k MWh2.0 MW × 8,760 hours
Actually generated2.2k MWhEPA eGRID, 2023 · ≈212 homes

Peaking or variableCapacity factor 13%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomass

Location

AddressOak Orchard Road
CityClay
CountyOnondaga County
StateNew York
ZIP13041
Coordinates43.17272, -76.13012
OperatorTesla Inc.

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar2.0 MWOperating2017

Grid context

NERC RegionNPCC
Balancing AuthorityNew York Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Onondaga County

View all plants in Onondaga County →

Explore more