Electric generating plantEIA plant no. 65614

Orange Coast College PH2 Solar Project

Type
Solar Photovoltaic
Nameplate capacity
5.2 MW
Units
2
In service since
2022
Operator
Solar Star Coastal Pirate, LLC
Location
Costa Mesa, Orange County, California
Rated 995th largest in California · 7414th of 14,761 in the U.S. · by nameplate

Orange Coast College PH2 Solar Project is a solar power plant in California with a nameplate capacity of 5.2 MW. It generates roughly 4.6k MWh per year — enough to power about 436 average U.S. homes.

Its capacity factor of 10% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Orange Coast College PH2 Solar Project could make 45.6k MWh. In 2023 it made 4.6k MWh — the same as running at full power 10 hours in every 100.

Nameplate, full year45.6k MWh5.2 MW × 8,760 hours
Actually generated4.6k MWhEPA eGRID, 2023 · ≈436 homes

Peaking or variableCapacity factor 10%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address2701 Fairview Rd.
CityCosta Mesa
CountyOrange County
StateCalifornia
ZIP92626
Coordinates33.67256, -117.91246
OperatorSolar Star Coastal Pirate, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
OCCSPSolar PhotovoltaicSolar3.1 MWOperating2022
OCCBABatteriesBattery2.1 MWOperating2022

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Orange County

View all plants in Orange County →

Data centers near Orange Coast College PH2 Solar Project

Data centerOperatorDistance
Xo Communications Colocation Data CenterNot recorded4.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map